Utilidor
Shown here is part of a three-mile underground concrete utility corridor, known as a utilidor, where one mile was upgraded, and two miles were constructed. The system now provides steam, condensate and water to facilities at the new F-35 complex.

Download Image: Full Size (2.58 MB)
Tags:
Photo by: Brian Schlumbohm |  VIRIN: 190805-A-XA877-1002.JPG